(A) The contractor’s purchasing system is suitable and authorised, and no materials weaknesses remain; or (e) When the Contractor gets the Contracting Officer’s last resolve of material weaknesses, the Contractor shall, within 45 times of receipt of the ultimate dedication, possibly appropriate the material weaknesses or post an acceptable corrective https://sethxzunf.webdesign96.com/34223854/detailed-notes-on-cpsr