The MCBs really should be clipped on to the Din bar along with the busbar into a present-day flowing terminal and limited screwed to provide present-day into the MCBs.Two sixteen/25mm tail cables, a single neutral and one other active are connected to the primary double pole switch on the meter. https://waylonpmeth.bloggip.com/35459155/emergency-electrician-services-uk-options