1

Advanced 400 kW Chiller Installation Secures £50K Annual Cost Reduction on Energy and 200 Tonnes CO₂ Cut

News Discuss 
Project Summary At a prominent confectionery site in York, Newsome has installed a cutting-edge 400 kW chiller, marking the timely execution of the project. Designed to advance ESG targets, the installation improves system dependability while minimising overall energy usage and CO₂ emissions. https://socials360.com/story11297558/advanced-400-kw-chiller-installation-secures-50k-yearly-energy-savings-and-200-metric-tonnes-co%E2%82%82-reduction

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story